129. Extend preflight coverage to pre_script and post_script
Date: 2026-09-24
Status
Accepted
Context
validation_loop.preflight_check runs a host-dependency probe only for the validation loop (ADR 0128). The original issue (#5074) and its follow-up (#5568) both noted that pre_script and post_script have the same host-dependency exposure. The cost differs between them: pre_script runs on the host before sandbox creation (in the pre-script execution block in internal/cli/run.go), so a missing dependency fails fast there; post_script runs after teardown, so its missing dependency is the higher-cost case this ADR closes. PR #6009 proposed a top-level preflight_check field covering all scripts, but it predates the schema-versioning work (ADR 0127) and the 2026-09-21 semantics incident (ADR 0128) and is now stale and conflicting.
Extending preflight to pre_script and post_script closes that gap, and this decision builds on ADR 0127 and ADR 0128 for the field's type and semantics.
Options
Per-script sibling fields (
pre_script.preflight_check, etc.). Rejected:pre_scriptandpost_scriptare flat strings, not structs, so siblings would force a breaking refactor of those fields into objects.Resource-resolved script field. Deferred: a single
sh -ccommand can combine dependency probes, but more involved checks may need a separately namedpreflight_script. Such a field would have to be delivered likepre_scriptunder ADR 0038, with an explicit host execution and working-directory contract; it must not reinterpret the existing literal-command field (ADR 0128).
Decision
Introduce a top-level preflight_check field on the harness that runs once, before sandbox creation, as a single host-dependency gate for pre_script, post_script, and validation_loop.
Top-level field, not per-script siblings. A single top-level field covers all scripts without a breaking refactor of the flat
pre_script/post_scriptstrings.Literal-command semantics. Consistent with ADR 0128, the top-level field is a literal
sh -ccommand (not a script path), subject to the sameHarness.Lint()path-pattern guard. Its implementation must also enforce ADR 0128's restricted credential environment and diagnostic-redaction release gates.Execution order and migration. The top-level check runs before
pre_script(ADR 0072) and before sandbox creation. A nonzero exit or timeout reports the failed preflight check and stops the run beforepre_script, sandbox creation, or any nested check. This eager gate also checks post-script dependencies on runs thatpre_scriptwould otherwise skip; authors must account for that trade-off. Implementation tests must verify ordering, failure, and skip paths with sentinel actions. Deprecatevalidation_loop.preflight_checkin favor of the top-level field once that replacement is implemented. During migration, existing nested checks continue to run after the top-level check (if present), so harnesses are not broken before they can move their probe. Before releasing the top-level field, when both checks are configured, enforce ADR 0128's shared expansion/process allowlist, rejection of excluded${VAR}references before expansion, and redaction of command/output diagnostics for both checks. Test excluded-token references and failure/timeout diagnostics on both paths. Nested-only harnesses retain their existing behavior until a separately planned compatibility migration; their current credential exposure is not fixed by the new top-level gate. Emit a deprecation warning only once the replacement is usable; removal requires a separately decided compatibility/version gate (ADR 0127).Composition. The field follows the scalar merge rule from ADR 0045: a child harness overrides the inherited value. An overriding child check must include the dependencies of any inherited
pre_script,post_script, and validation script still present in the composed harness; it does not append to the base check. Overlay-selected scripts can also replace those scripts while the check remains top-level: authors must cover the union of dependencies across possible matching overlays, even though an inactive overlay's probe can fail an otherwise eligible run. Implementation tests must cover a child override with an inherited script dependency and an overlay-selected script dependency.Consumer rollout. Publishing or advancing a harness pin that relies on the top-level check requires verification that every pinned fullsend consumer has a version that executes the field; an older loader silently ignores the added YAML key even when
schema_versionremains1(ADR 0127). Release the supporting CLI first, exercise a run that proves the check precedespre_scriptand sandbox creation on each consumer, and retain nested checks until that verification and migration finish. If a consumer fails verification, keep or restore its previous harness pin; do not publish a harness whose safety depends on an ignored check.
Consequences
- One host-dependency gate covers all scripts; failures are caught before sandbox creation rather than after the agent completes.
- Backward compatible: harnesses without a top-level field behave exactly as today, including execution of the nested check during migration.
- This decision supersedes the design in PR #6009; the PR's disposition is left to normal triage.
- This decision resolves the design question in #5568 (top-level field vs. per-script siblings); implementation is tracked separately.
- Follow-ups out of scope here: a separately named, resource-delivered
preflight_scriptfor more complex probes (see ADR 0128), a deprecation-warning/removal timeline, and choosing a concrete minimum CLI release after the top-level field ships.